Materials:

* Box for machines (size and type depend on the number of machines)
* Screws
* Screwdriver or drill
* Level
* Tape measure or ruler

Instructions:

1. Select installation location: Select a location that meets the following requirements:
*Availability of machines
* Sufficient space to open machine doors/covers
* No obstructions such as pipes or wires

2. Determine the installation height: The standard height for installing boxes under vending machines is 1.5 meters from the floor to the bottom edge of the box. Use a tape measure or ruler to mark the height on the wall.

3. Mark holes for screws: Place the box against the wall at the desired height. Use a pencil or small nail to mark the locations for the screw holes.

4. Remove the box and drill holes: Remove the box from the wall and drill holes at the marked locations. The depth of the holes should correspond to the length of the screws.

5. Install the box: Insert the screws into the drilled holes. Use a screwdriver or drill to tighten the screws and install the box.

6. Level the box: Use a level to level the box horizontally and vertically. Adjust the screws as needed until the box is level.

7. Connect the machines: Connect the machines to the box in accordance with the instructions included with the machines. Make sure all wires are securely connected and secured.

8. Close the doors: Close the doors or covers of the machines and ensure that they close completely and are locked in the closed position.

Adviсe:

*Use a box of the appropriate size for the number of machines being installed.
*Choose screws that are long enough to securely mount the box to the wall.
*If the wall is uneven, use shims to level the box before installation.
* Connect the machines in accordance with the electrical diagram presented in the instructions for the machines.

Leave a Reply