Materials and tools:
* Junction box
* Circuit breakers
* Wires
* Side cutters
* Screwdriver or screwdriver
Instructions:
1. Turn off the power
*Before starting work, be sure to turn off the power at the main distribution board.
2. Install the distribution box
* Determine a suitable location for the junction box and install it on the wall or ceiling using screws or dowels.
3. Connect the incoming wire
*Connect the incoming wire to the main bus in the junction box. Make sure that the wire matches the rated current of the machines.
4. Install circuit breakers
*Insert the circuit breakers into the distribution box.
* Ensure that circuit breakers are rated for the amperage rating of the wiring and equipment they will protect.
5. Connect loads
* Route the wires from the machines to the appropriate loads (sockets, lighting, etc.).
* Connect the wires to the load and circuit breaker terminals using suitable connectors.
6. Take the necessary measurements
*Use a multimeter or other suitable measuring instrument to check whether the voltage and current are within the rated values.
7. Turn on the power
* After checking all connections and measurements, turn on the power at the main distribution board.
8. Check functionality
* Ensure that all circuit breakers operate correctly and protect the associated loads from overload and short circuit.
Additional tips:
* Use wires of the appropriate size for the rated current of the breakers.
* Properly secure the wires in the terminals to prevent loosening and overheating.
*If you do not have experience with electrical work, it is recommended that you contact a qualified electrician.