Materials and tools:

* Junction box
* Circuit breakers
* Wires
* Side cutters
* Screwdriver or screwdriver

Instructions:

1. Turn off the power

*Before starting work, be sure to turn off the power at the main distribution board.

2. Install the distribution box

* Determine a suitable location for the junction box and install it on the wall or ceiling using screws or dowels.

3. Connect the incoming wire

*Connect the incoming wire to the main bus in the junction box. Make sure that the wire matches the rated current of the machines.

4. Install circuit breakers

*Insert the circuit breakers into the distribution box.
* Ensure that circuit breakers are rated for the amperage rating of the wiring and equipment they will protect.

5. Connect loads

* Route the wires from the machines to the appropriate loads (sockets, lighting, etc.).
* Connect the wires to the load and circuit breaker terminals using suitable connectors.

6. Take the necessary measurements

*Use a multimeter or other suitable measuring instrument to check whether the voltage and current are within the rated values.

7. Turn on the power

* After checking all connections and measurements, turn on the power at the main distribution board.

8. Check functionality

* Ensure that all circuit breakers operate correctly and protect the associated loads from overload and short circuit.

Additional tips:

* Use wires of the appropriate size for the rated current of the breakers.
* Properly secure the wires in the terminals to prevent loosening and overheating.
*If you do not have experience with electrical work, it is recommended that you contact a qualified electrician.